StreetStangs.net  

Go Back   StreetStangs.net > Technical > Project Cars

Reply
 
Thread Tools Display Modes
Old 06-18-2007, 04:05 PM   #11
redhorse
Senior Member
 
redhorse's Avatar
 
Join Date: Jul 2005
Location: Trussville, Al
Posts: 819
Send a message via Yahoo to redhorse
The purchase of pistons, connecting rods, rings and flywheel is now complete. Project Redhorse will now be going to the machine shop soon. The goodie list goes something like this:

Probe pistons
Eagle connecting I-Beams
Rings
Aluminum Flywheel
Awaiting the return from the machine shop a Typhoon Power Plus Intake is setting on the floor.
__________________
Mean Little Man
redhorse is offline   Reply With Quote
Old 06-18-2007, 04:06 PM   #12
QWKSNKE
3v's are slow
 
QWKSNKE's Avatar
 
Join Date: Dec 2004
Location: Here and There
Posts: 17,152
Nice.. Are you building the motor or is Paul?
__________________
2009 Porsche Carrera S
2008 ///AMG C63.. Eurocharge Tune. RIP
2019 AMG GLC43..wife's
03 F250 SD.. Edge Evo, AFE Stage 1 CAI
08 GT. JBA axle back, FRPP springs, FRPP swaybars.. daughter's
01 Cobra vert... wife's

I need a new toy
QWKSNKE is offline   Reply With Quote
Old 06-19-2007, 03:51 PM   #13
redhorse
Senior Member
 
redhorse's Avatar
 
Join Date: Jul 2005
Location: Trussville, Al
Posts: 819
Send a message via Yahoo to redhorse
It will be a joint venture. Since I have never undertaken such a project,we will be closely supervised.
__________________
Mean Little Man
redhorse is offline   Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -6. The time now is 10:11 AM.


Powered by vBulletin® Version 3.8.2
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.